As the curtains draw on 2023, Kochi reflects upon a year filled with highs and lows, promising beginnings, and lingering challenges. The city, known for its vibrant culture and evolving landscape, witnessed a myriad of developments that shaped the narrative of the past twelve months. Let’s take a closer look at the good, the bad, and the ugly of Kochi in 2023.
The Challenges:
1. Brahmapuram Mess:
The Biomining project at Brahmapuram faced setbacks, leading to allegations of a scam. A major fire disrupted waste management, but a silver lining emerged with the approval of Bharat Petroleum Corporation Limited’s bio-CNG waste treatment plant.
2. Night Curbs Backlash:
Plans for night curbs at Marine Drive and Thrikkakara faced public outcry, causing authorities to retract the proposals deemed illogical and regressive.
3. Renovation Delays:
Renovation of nine parks under GCDA missed the deadline, promising completion in the coming months.
4. JLN Stadium Roof Pending:
The Kaloor International Stadium’s roof renovation faced delays, with a recent incident highlighting safety concerns. Remedial measures are set to begin in 2024.
5. Modern Abattoir on Paper:
The long-awaited modern abattoir project remains on paper, with funding approved, tenders floated, and construction expected to commence next year.
6. Mosquito Menace Persists:
Despite assurances and budget allocations, the city grappled with a persistent mosquito menace, leaving residents dissatisfied.
The Triumphs:
1. Decentralized Waste Management:
Overcoming criticism from the Brahmapuram disaster, the corporation successfully implemented decentralized waste management systems in several divisions, emulating the Thumburmuzhi model.
2. Water Metro Services Launched:
Kochi Water Metro services connecting various terminals were launched, garnering over 10 lakh passengers within eight months. Terminals are nearing completion, with services set to expand further.
3. Kochi Metro Rail Progress:
The second phase of Kochi Metro commenced, and Phase 1-B extension trials were successful. Phase 3, the airport line, is slated to begin in 2024.
4. Rajendra Maidan Renovation:
The iconic Rajendra Maidan underwent renovation, introducing a ‘pet park’ concept, becoming a hotspot for pet owners and enthusiasts.
5. Operation Breakthrough’s Success:
Kochi managed to avoid significant waterlogging, thanks to Operation Breakthrough and ongoing canal renovation work.
The Concerns:
1. Mission 2024:
The escalating drug use among youngsters, including schoolchildren, emerged as a major concern. Authorities emphasize the need for a comprehensive action plan.
Looking Ahead:
As Kochi navigates through the successes and challenges of 2023, the city gears up for the future with ongoing projects like the Kochi Metro expansion and the promise of a rejuvenated Rajendra Maidan. While celebrating triumphs, addressing concerns, and learning from setbacks, Kochi paves the way for a dynamic and resilient 2024.